Engineering Reference

Resource Center

Practical engineering explanations written by a licensed Professional Engineer for practitioners at every level.

Transportation Design

Understanding AASHTO Stopping Sight Distance

Why perception-reaction time, friction factors, and roadway grade each affect AASHTO stopping sight distance design.

Read article →
Hydraulics & Drainage

Manning's Equation for Storm Drain Design

A practical guide to Manning's n values, hydraulic radius, and full-pipe vs. partial-flow storm drain analysis.

Read article →
Pavement Engineering

AASHTO 1993 Flexible Pavement Design: Key Concepts

Structural number, ESALs, reliability, and subgrade resilient modulus explained for AASHTO 1993 flexible pavement design.

Read article →
Transportation Design

Horizontal Curve Elements Explained

How tangent length, arc length, external distance, and middle ordinate define a horizontal curve, and how degree of curve relates to radius.

Read article →
Transportation Design

Vertical Curve Design: K-Values and High/Low Points

How AASHTO parabolic vertical curves are defined by the K-value, and how to locate the high or low point for sight distance and drainage checks.

Read article →
Grading & Sitework

Earthwork Volume: Average End Area Method Explained

How the average end area method computes cut/fill volume from cross-section data, and how swell factors convert bank volume to loose volume.

Read article →
Traffic Engineering

Webster's Method for Signal Timing

How Webster's method computes optimal signal cycle length and phase splits from critical volume-to-saturation-flow ratios, and where it applies.

Read article →
Drainage & Hydrology

The Rational Method for Peak Runoff

How the Rational Method (Q=CiA) estimates peak runoff, how composite runoff coefficients work, and when the method stops being reliable.

Read article →
Drainage & Hydrology

Time of Concentration: Kirpich vs. TR-55

When to use the Kirpich formula versus the TR-55 three-segment method for time of concentration, and why Tc controls rainfall intensity selection.

Read article →
Transportation Design

AASHTO Passing Sight Distance Components

How AASHTO's four-component passing sight distance model (d1 through d4) is assembled for two-lane highway design.

Read article →
Transportation Design

Superelevation Design: Balancing e and f

How AASHTO balances superelevation rate and side friction on horizontal curves, and how to compute superelevation runoff length.

Read article →
Drainage & Hydrology

Culvert Sizing: Preliminary Design with Manning's Equation

How full-flow Manning's equation gives a preliminary culvert diameter, and why inlet/outlet control analysis is still required for final design.

Read article →
Transportation Design

AASHTO Intersection Sight Distance: Case B Explained

How AASHTO's Case B time-gap method sets intersection sight distance for stop-controlled minor roads, and why vehicle type, grade, and lane count all matter.

Read article →
Geotechnical Engineering

Terzaghi Bearing Capacity: How Shallow Footings Are Sized

How Terzaghi's three bearing capacity terms — cohesion, surcharge, and soil weight — combine to set the allowable pressure under a shallow footing.

Read article →
Drainage & Hydrology

Detention Pond Sizing: The Triangular Hydrograph Method

How the simplified triangular hydrograph method estimates required detention storage volume, and when a full routing analysis is still required.

Read article →
Structural & Geotechnical

Cantilever Retaining Wall Stability: Overturning and Sliding

How Rankine active earth pressure drives the overturning and sliding stability checks for a cantilever retaining wall, and what the calculator doesn't check.

Read article →