Engineering Reference
Resource Center
Practical engineering explanations written by a licensed Professional Engineer for practitioners at every level.
Understanding AASHTO Stopping Sight Distance
Why perception-reaction time, friction factors, and roadway grade each affect AASHTO stopping sight distance design.
Read article → Hydraulics & DrainageManning's Equation for Storm Drain Design
A practical guide to Manning's n values, hydraulic radius, and full-pipe vs. partial-flow storm drain analysis.
Read article → Pavement EngineeringAASHTO 1993 Flexible Pavement Design: Key Concepts
Structural number, ESALs, reliability, and subgrade resilient modulus explained for AASHTO 1993 flexible pavement design.
Read article → Transportation DesignHorizontal Curve Elements Explained
How tangent length, arc length, external distance, and middle ordinate define a horizontal curve, and how degree of curve relates to radius.
Read article → Transportation DesignVertical Curve Design: K-Values and High/Low Points
How AASHTO parabolic vertical curves are defined by the K-value, and how to locate the high or low point for sight distance and drainage checks.
Read article → Grading & SiteworkEarthwork Volume: Average End Area Method Explained
How the average end area method computes cut/fill volume from cross-section data, and how swell factors convert bank volume to loose volume.
Read article → Traffic EngineeringWebster's Method for Signal Timing
How Webster's method computes optimal signal cycle length and phase splits from critical volume-to-saturation-flow ratios, and where it applies.
Read article → Drainage & HydrologyThe Rational Method for Peak Runoff
How the Rational Method (Q=CiA) estimates peak runoff, how composite runoff coefficients work, and when the method stops being reliable.
Read article → Drainage & HydrologyTime of Concentration: Kirpich vs. TR-55
When to use the Kirpich formula versus the TR-55 three-segment method for time of concentration, and why Tc controls rainfall intensity selection.
Read article → Transportation DesignAASHTO Passing Sight Distance Components
How AASHTO's four-component passing sight distance model (d1 through d4) is assembled for two-lane highway design.
Read article → Transportation DesignSuperelevation Design: Balancing e and f
How AASHTO balances superelevation rate and side friction on horizontal curves, and how to compute superelevation runoff length.
Read article → Drainage & HydrologyCulvert Sizing: Preliminary Design with Manning's Equation
How full-flow Manning's equation gives a preliminary culvert diameter, and why inlet/outlet control analysis is still required for final design.
Read article → Transportation DesignAASHTO Intersection Sight Distance: Case B Explained
How AASHTO's Case B time-gap method sets intersection sight distance for stop-controlled minor roads, and why vehicle type, grade, and lane count all matter.
Read article → Geotechnical EngineeringTerzaghi Bearing Capacity: How Shallow Footings Are Sized
How Terzaghi's three bearing capacity terms — cohesion, surcharge, and soil weight — combine to set the allowable pressure under a shallow footing.
Read article → Drainage & HydrologyDetention Pond Sizing: The Triangular Hydrograph Method
How the simplified triangular hydrograph method estimates required detention storage volume, and when a full routing analysis is still required.
Read article → Structural & GeotechnicalCantilever Retaining Wall Stability: Overturning and Sliding
How Rankine active earth pressure drives the overturning and sliding stability checks for a cantilever retaining wall, and what the calculator doesn't check.
Read article →